Fire & Gas System Upgrade
Currently, We are responsible for improving and upgrading the Wonderware system for 12 control rooms (sites) for increased expansion and growth of the whole Gas and Fire system in ZADCO – Zirku Island. After the...

We used the existing Wonderware System Platform to successfully administer SCADA modification services and upgraded the SCADA Database while simultaneously creating new Graphic pages that were according to the...
We used the existing Wonderware System Platform to successfully administer SCADA modification services and upgraded the SCADA Database while simultaneously creating new Graphic pages that were according to the requirements of OGC for IPP2 and Salalah GSS sites. TeQnovation, in cohesion with Ray International Group , satisfied all OGC requirements through the expansion of the system by using the modern Wonderware System Platform in place. The primary goal of this project was to ensure data centralization using the existing Wonderware System Platform solution. With this implementation, the main objective was to enable dynamic control and monitoring of IPP2 and GSS sites from OGC MCC at Muscat by using the concept of a single-window HMI .
Currently, We are responsible for improving and upgrading the Wonderware system for 12 control rooms (sites) for increased expansion and growth of the whole Gas and Fire system in ZADCO – Zirku Island. After the...
TeQnovation used Wonderware System Platform 2014 R2 to completely upgrade the Wonderware system. Besides, we successfully upgraded the system with a downtime of 0% and upgraded 18 operator desktops and 11 serves without...
Petroleum Development Oman awarded a Wonderware system support contract to TeQnovation. We successfully guided and trained PDO Real Time Operations team to manage the entire Wonderware System, one of the largest systems...